Strengthens the sandstone plants, ready-mixed-concrete plants, domestic asphalt concrete plants, dumping sites, open burning, and worship goods burning’s air pollution control project

Absrtact
1. We did 334 times of patrols before Dec, 2006. The statistics of our inspection data demonstrated that there are 24 sandstone plants, 21 ready-mixed-concrete plants, 4 domestic asphalt concrete plants and 5 dumping sites, the total is 54. By entire distributed situation analysis, the four professions most concentrated in Taitung City ( 20 plants ), in order is 7 in Taimali Shiang and 6 in Dawu Shiang. If says by the basin, the maximum is Benan river, 11 plants. Above the distribution situation analysis result may take does an inspection reference which the propotional distribution and the route plans. 2. In pollution control measures installation proportion ( as table 4.1-7~10 ), only sandstone plants have lower proportion at unloaded slope way and dumping area in whole, about 48% and 69%, demonstrated this part needs again to strengthen the counseling control work. But compared with 42% and 54% last year, it has some promotion. 3. In counseling improvement aspect, we completed 5 counsels, that is 4 sandstone plants ( Lu-Yuan, Jiou-Ming, Hao-Ye and Jyun-Fa ) and 1 ready-mixed-concrete plant ( Dong-Hong-Hang ) before the end of Dec, 2006, their improvements is material piles cover the dust screen, paths inside and outside the factory or exposed ground established devices sprinkling water, and established the vehicle washing facility at the entrance. The improvement situation of each plants is showed in table 4.2-1 and figure 4.2-1. We estimated this part’s emission reduces about 67.59 ton/year of particulate matter. 4. This year we have 30 participants on road care, the total length is 13.64 km, actual wash and sweep length is 2222.82 km ( 1835.01 km for wash, 387.81 km for sweep ). The TSP emission reduced about 30.67 ton/year, PM10 emission reduced about 5.78 ton/year. 5. We completed 26 plants’ inspection examination, which including 16 sandstone plants, 8 ready-mixed-concrete plants and 2 domestic asphalt concrete plants. The result showed each factory’s measured value is lower than TSP emission standard of peripheral boundary testing, 500 mg/Nm3, like figure 4.6-1. 6. We carried on cooperating forestation and beautification with Taitung government agriculture bureau, before the end of Dec, 2006. We total have 17 participants, they applied for 4120 sapling and sown area is 15183 m2, TSP emission reduced 0.446 ton/year, like table 4.7-2. The work team selected some finer factories this year, and taken some pictures which will offer to other factories have not applied. 7. We held a promulgation conference for dealers of sandstone plants, ready-mixed-concrete plants, domestic asphalt concrete plants and dumping site. We hoped they can correctly and rapidly understand the coordinate item through the integrity regulation guidance and pollution control system counseling. We also conducted an air pollution control self-criticism meeting, discussed each good and bad points together with dealers, and provided the feasible improvement methods for enhancement of Taitung County’s control effecs. 8. Taitung is a agriculture county, rice sown area is about 6500 ha/period, 13000 ha/year. In harvest season, May to June and November to December every year, the farmers burning straw which produce the massive mist and dust. In order to improve this situation, we held 4 conferences before first and second harvest, and broadcasted six days by the propaganda car to various villages. We held a straw on-site usage technology conference at Chisang Shiang leisure agriculture and high quality traveling experience at Nov 4, 2006. In order to prevent open burning of some farmers and populace, we strengthened the patrol and ferreted out 103 burnings, advised them extinguish the fire. We estimated each pollutant’s emission reduction is TSP 4.90 ton, PM10 4.58 ton, SOX 0.04 ton, NOX 1.08 ton, CO 33.88 ton, VOC 5.04 ton. Moreover, we accepted the fire department to examine the wooded mountain field ignition burning application case, for the farmers’ needs to handle sick straw or plant not easy to transport. 9. In promulgation of worship goods burning, we requested their reduction on moral grounds, and we used placard, flyer, and mass media for promulgation before universal salvation.+ 10. This plan carried out progress to complete the contract quality.
Keyword
sandstone plant, open burning, worship goods, pollution control
Open
top